Journal article 373 views 56 downloads
Overcoming the performance limitations of hybrid redox flow batteries with modular operation
Journal of Energy Storage, Volume: 81, Start page: 110280
Swansea University Authors: Jenny Baker , Justin Searle , Tom Griffiths, Richard Lewis
-
PDF | Version of Record
© 2024 The Authors. This is an open access article under the CC BY license.
Download (1.82MB)
DOI (Published version): 10.1016/j.est.2023.110280
Abstract
To help solve the energy trilemma, energy storage technologies must demonstrate low cost and high efficiency to avoid inflating the cost of renewable power. Hybrid redox-flow batteries are a promising multi-hour storage technology, as they use low cost chemicals in an easily recyclable format. Howev...
Published in: | Journal of Energy Storage |
---|---|
ISSN: | 2352-152X |
Published: |
Elsevier BV
2024
|
Online Access: |
Check full text
|
URI: | https://cronfa.swan.ac.uk/Record/cronfa65212 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Abstract: |
To help solve the energy trilemma, energy storage technologies must demonstrate low cost and high efficiency to avoid inflating the cost of renewable power. Hybrid redox-flow batteries are a promising multi-hour storage technology, as they use low cost chemicals in an easily recyclable format. However, they suffer from low efficiency at low power output, and require periodic maintenance downtime to remove metal from the anode. Here, we show that a modular system can overcome these challenges with appropriate control. A novel optimisation model for modular operation with periodic maintenance is parametrised from a commercial zinc‑bromine hybrid RFB. Independent module control was predicted to improve operational efficiency, with six modules achieving 73 % compared to the peak efficiency of 80 %. A non-obvious schedule for maintenance was determined algebraically, where energy is transferred from a module due maintenance to one that is fresh. It is found that staggering the strip cycles across several days and performing them when PV and load are roughly in balance in the morning is the optimal timing. The findings are significant as they show that maintenance does not preclude hybrid RFB from firm power provision, and that high efficiency is possible during operation through modular control. |
---|---|
Keywords: |
Hybrid redox flow battery; Zinc bromine; Modular; Maintenance scheduling; Firm PV; Self-sufficiency |
College: |
Faculty of Science and Engineering |
Funders: |
his work was supported by the Engineering and Physical Sciences Research Council (EPSRC) through SPECIFIC Innovation and Knowledge Centre (EP/N020863/1), and the CDT for Energy Storage and its Applications (EP/L016818/1). Dr. Jenny Baker was also funded through ECR Fellowship NoRESt (EP/S03711X/1). The work at Sheffield was also supported by Drax Group. The funding sources were not involved in decisions relating to the execution and publication of this work. |
Start Page: |
110280 |